Swiss perspectives in 10 languages

Zurich’s ‘ugliest bridge’ to be pulled down

Keystone

The Rathausbrücke (town hall bridge), which crosses the River Limmat in the centre of Switzerland’s largest city, is to be demolished to make way for a replacement. Renovation is simply not possible, say the authorities. 

The concrete construction, built in 1972 and considered by many to be a blot on the landscape (although others appreciate its width and lack of cars), is known by locals as “Vegetable Bridge” because of the market that was once held on it. 

Work is set to begin in 2022 and take up to three years, with costs estimated at CHF20 million ($20.9 million)


News

View onto the Loetschberg Base Tunnel's southern ramp, pictured from a BLS Bombardier Transportation low-floor multiple unit named "Loetschberger" of the type RABe 535, driving from Spiez, Canton of Berne, to Brig, Canton of Valais, Switzerland, on May 16, 2017.

More

Train line between Brig and Domodossola interrupted

This content was published on One day after a derailment approximately 15 kilometres from the Swiss border, BLS is running buses for passengers between Preglia and Domodossola, in Italy.

Read more: Train line between Brig and Domodossola interrupted

In compliance with the JTI standards

More: SWI swissinfo.ch certified by the Journalism Trust Initiative

You can find an overview of ongoing debates with our journalists here . Please join us!

If you want to start a conversation about a topic raised in this article or want to report factual errors, email us at english@swissinfo.ch.

SWI swissinfo.ch - a branch of Swiss Broadcasting Corporation SRG SSR

SWI swissinfo.ch - a branch of Swiss Broadcasting Corporation SRG SSR